Copy Link
Add to Bookmark
Report

Roles and Responsibilities? Stage 4 Riba

AniphaeS's profile picture
Published in 
Architecture
 · 10 Apr 2024

Architect

  • Overview: Primarily responsible for the design of the project, playing a crucial role in developing the technical design documents during Stage 4.

  • Responsibilities:

    • Coordinating with engineers and other consultants to integrate all technical aspects into the design.
    • Developing detailed drawings and specifications that adhere to regulatory standards.
    • Assisting with the selection and evaluation of materials and systems.
    • Addressing modifications required by planning authorities or by the client.

Structural Engineer

  • Overview: Focuses on the structural integrity of the construction, ensuring stability and durability.

  • Responsibilities:

    • Designing and calculating the strength of various structural elements.
    • Ensuring the structure meets all relevant building codes and performance standards.
    • Collaborating closely with the architect to integrate structural requirements with aesthetic and functional design.

MEP Engineer

  • Overview: Specializes in the design and integration of mechanical, electrical, and plumbing (MEP) systems into the building design.

  • Responsibilities:

    • Designing MEP systems that meet all applicable codes and requirements.
    • Ensuring that MEP design is integrated with the architectural and structural designs.
    • Coordinating with contractors for the installation of MEP systems.

Critical Checklist questions:

The questions below serve as critical checkpoints, guiding architects and design teams . They ensure every aspect of the project is closely addressed, setting a solid foundation for the construction phase to commence:

  • How do the technical designs align with current building regulations and standards?
  • How are sustainable design principles and materials incorporated into the technical design to meet environmental and energy efficiency goals?
  • Are the architectural and engineering designs detailed enough to ensure clear guidance for the construction team?
  • How will the design team collaborate with the chosen contractors to ensure the design is executed as planned?
  • What risk management strategies are in place to address potential issues during the construction phase?
  • How does the technical design adhere to the project's budget while maintaining quality and functional objectives?
  • What materials and resources are specified in the design, and how do they align with the project's sustainability and durability goals?
  • How does the design ensure accessibility for all users in compliance with regulations?
  • How are the mechanical, electrical, and plumbing systems integrated into the design for efficiency and functionality?
  • What procurement strategy is being used, and how does it impact the design and construction process?
  • How is feedback from previous project stages incorporated into the technical design?
  • How does the design ensure compliance with all relevant safety and building codes?
  • How is value engineering used to optimise the project cost without compromising on design quality?
  • What criteria are being used to select contractors during the tendering process?
  • How feasible is the construction based on the technical design, and what challenges are anticipated?

← previous
next →
loading
sending ...
New to Neperos ? Sign Up for free
download Neperos App from Google Play
install Neperos as PWA

Let's discover also

Recent Articles

Recent Comments

Neperos cookies
This website uses cookies to store your preferences and improve the service. Cookies authorization will allow me and / or my partners to process personal data such as browsing behaviour.

By pressing OK you agree to the Terms of Service and acknowledge the Privacy Policy

By pressing REJECT you will be able to continue to use Neperos (like read articles or write comments) but some important cookies will not be set. This may affect certain features and functions of the platform.
OK
REJECT